MANELWALA MINI HYDRO POWER PROJECT (2,400kW)
Type of contract
Water Source
Design Flow
Gross Head (Weir to Power House)
Length of the head race channel
Head Loss of head race channel
Gross Head (from Fore-bay to Power House)
Length of the penstock path
Head loss of penstock path
Net head of the project
|
Turn key on civil construction
Kurudu Oya
1.05 m3/sec.
305 m
1,890 m
6 m
299 m
939 m
11 m
288 m
|
|
|
|